To replace the linear guide bushings, please proceed as follows:
  1. Disconnect the electrical and pneumatic supply of the entire conveyor system and secure against reconnection.
  2. Remove the lower protective housing to get clear access to the guide bushings.
  3. Release the tab washers of the shaft connector attachment bolts (with suitable tools).
  4. Remove the attachment bolts and the cross connector.
  5. Each guide bushing is mounted with four attachment bolts. Unscrew the bolts to remove the entire linear guide.
  6. Please follow the steps in reverse order to reinstall the new linear guide bushings.
    Make sure that the linear shaft is cleaned
  7. Manually lift the unit to check if the unit lifts and lowers properly and freely.
  8. Install all safety covers before operating the unit again.
Clean the guide shaft before reinstallation and make sure that all bolts get tightened and the shafts are aligned.
 

Lift Locate Replacement of linear guide bushings 1

Lift Locate Replacement of linear guide bushings 2

Lift Locate Replacement of linear guide bushings 3

Lift Locate Replacement of linear guide bushings 4

Lift Locate Replacement of linear guide bushings 5

Lift Locate Replacement of linear guide bushings 6

Lift Locate Replacement of linear guide bushings 7

Lift Locate Replacement of linear guide bushings 8